Projects under Construction
TAX 2016A NEIGHBORHOOD ALLEY REPLACEMENT PROJECT #3
Selected neighborhood alleyways were chosen to be reconstructed based on pavement study results. Impacted alleyways are associated with Woodhurst Place North & South, Willow Springs Drive, Park Meadow Way and Glenwood Drive. Construction is scheduled to start in late summer 2017 and is anticipated to be complete in late spring 2018. This project was awarded to IIPL USA, LLC in the amount of $847,300.00. Caution should be exercised by anyone travelling within the alley construction zone.If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov
PROJECTS IN DESIGN
#ST 15-01A FREEPORT PARKWAY, (BETHEL RD TO I-635)
A design contract for Freeport Parkway improvements was awarded to J. Volk Consulting in December 2015 for a total contract amount of $726,000. The design will include all work necessary for the reconstruction of the road and a realignment of the existing bridge. Construction is anticipated to begin in 2017.
If you have questions about the project, please contact Kent Collins, Assistant Director of Engineering at (972)304-7019 or email kcollins@coppelltx.govTAX 2014A PARKWAY BOULEVARD
A design contract for the Parkway Blvd. improvements was awarded to J. Volk Consultants, Inc. in August 2015. The project consists of concrete panel replacement, crack repairs, utility upgrades and sidewalk ramp improvements. The project will also improve drainage. Construction is anticipated to begin spring 2018.
If you have questions about the project, please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov
TAX 2014C TOWN CENTER BOULEVARD RECONSTRUCTION PROJECT
The design for these improvements is currently underway with JQ Infrastructure. The project will impact the portion from the Town Center Shopping Center to north of the intersection of Town Center Drive. The project includes complete pavement reconstruction, utility upgrades and sidewalk infill. Construction is anticipated to begin late 2017.
If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov
TAX 2015B PLANTATION DRIVE AND MOSSY OAKS STREET RECONSTRUCTION PROJECT
The design for these improvements is currently underway with Pape-Dawson Engineers. The project will impact the entire length of Plantation Drive and Mossy Oaks Street. The project includes complete pavement reconstruction and utility upgrades. Construction is anticipated in FY 2018-2019.
If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov