​​​​​​​​​​​​​​​​PROJECTS UNDER CONSTRUCTION

​​​​

TAX 2014C TOWN CENTER BOULEVARD RECONSTRUCTION PROJECT
Beginning Monday, October 9 through Friday, December 1, a portion of Town Center Boulevard, from Town Center Shopping Center to the intersection of Town Center Drive will be closed to traffic for Phase 1 of construction, which will include pavement reconstruction, utility upgrades and sidewalk infill. 

All businesses in this area will remain open during the project and will be accessible via driveways on Town Center Drive, Denton Tap Road and the Town Center Shopping Center.

The construction plans for Town Center Boulevard will also include a Phase 2 and Phase 3, which will be announced at a later date. The entire project is expected to be complete by late Spring 2018.​

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

TAX 2016A  NEIGHBORHOOD ALLEY REPLACEMENT PROJECT #3

Selected neighborhood alleyways were chosen to be reconstructed based on pavement study results. Impacted alleyways are associated with Woodhurst Place North & South, Willow Springs Drive, Park Meadow Way and Glenwood Drive. Construction is scheduled to start in late summer 2017 and is anticipated to be complete in late spring 2018. This project was awarded to IIPL USA, LLC in the amount of $847,300.00. Caution should be exercised by anyone travelling within the alley construction zone.

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

PROJECTS IN DESIGN

#ST 15-01A  FREEPORT PARKWAY, (BETHEL RD TO I-635)

A design contract for Freeport Parkway improvements was awarded to J. Volk Consulting in December 2015 for a total contract amount of $726,000.  The design will include all work necessary for the reconstruction of the road and a realignment of the existing bridge.  Construction is anticipated to begin in 2017.

If you have questions about the project, please contact Kent Collins, Assistant Director of Engineering at (972)304-7019 or email kcollins@coppelltx.gov​

TAX 2014A  PARKWAY BOULEVARD

A design contract for the Parkway Blvd. improvements was awarded to J. Volk Consultants, Inc. in August 2015.  The project consists of concrete panel replacement, crack repairs, utility upgrades and sidewalk ramp improvements.  The project will also improve drainage.  Construction is anticipated to begin spring 2018.

If you have questions about the project, please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

TAX 2015B PLANTATION DRIVE AND MOSSY OAKS STREET RECONSTRUCTION PROJECT 

The design for these improvements is currently underway with Pape-Dawson Engineers. The project will impact the entire length of Plantation Drive and Mossy Oaks Street. The project includes complete pavement reconstruction and utility upgrades. Construction is anticipated in FY 2018-2019.

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov​​

SIDEWALK REPAIR PROCESS

1. DAMAGED SIDEWALK IS DEMOLISHED & REMOVED

2. GROUND IS COMPATCED & PREPARED

3. WOOD FORMS ARE SET AND REBAR IS PLACED

4. CONCRETE IS POURED & CURES/DRIES TYPICALLY 24-72 HOURS

5. CONTROL JOINTS ARE SAWCUT AND SEALANT IS APPLIED TO EXPANSION JOINTS, IF ANY​


FUTURE PROJECTS

AIRLINE DRIVE
S​ BELT LINE R​OAD
CAMBRIA DRIVE